IMRI

crumbs_icon

>

>

Heavy Rail of 60E1/UIC60 rails

Heavy Rail of 60E1/UIC60 rails

The 60E1 track is a railway track manufactured in accordance with the European standard EN 13674-1 and is also known as UIC60. The weight of this kind of track is 60.21 kilograms per meter and it is mainly used in railway construction. This type of track is widely used in the railway industry.

Email:

sales@imristeel.com

Phone:

+86 13646172523

Quote Now
Product Detail
Packaging & Delivery
Related Products

Drawing and Size Tolerance

Tolerance of 60E1 Rail Type (mm)
Head width±0.5
Foot width+1.0,-0.5
Web thickness+0.8,-0.5
Rail height±0.8
Point height+1.0,-0.5
Web height+0.3,-0.7
Deviation of tread shape
from nominal shape (along the symmetry axis)
±0.5
Convexity of foot (uniform)0.5
Concavity of footNot allowed
Profile deviation from symmetry (asymmetry)±1.3
Permitted deviation from rail length, mm±20

Chemistry Component

CSiMnPSCrVALOther elements
0.62-0.800.15-0.850.70-1.20≤0.025≤0.0250.20
Note: Residual and tolerance of chemical component of finished rail according to R260

 

Mechanical Properties

RailTensile strength,

N/mm2

Yield point,

N/mm2

HB
UIC60≥880≥420260

Mark

 

Other Notable Features:

The rail is a T-section rail (flat bottom rail).

It’s used for medium and heavy traffic applications.

The section is designed for speeds up to 160 kmph and traffic density of about 60 Gross Million Tonnes.

It has an optimized design for consistent dimensions and precise geometry, ensuring smooth rail journeys.

It is built for durability and can withstand heavy loads, weather extremes, and consistent usage.

The rail’s precise engineering and uniformity contribute to track stability and efficient transportation.

It is adaptable for various rail projects, including high-speed rail and freight networks.

Packaging & Delivery

Packaging & Delivery

· Packaging Details: Bundles wrapped with strong steel trips, or according to customers’ requirements.The length of the rail can be selected as 12 meters, 12.5 meters, 18 meters, 24 meters or 25 meters.
· Port: Tianjin Port
· Lead Time: Within 20-30 days depends on the order quantity

Packaging & Shipping

· Minimum order quantity: 500 tons
· Price: FOB at Xin’gang port in Tianjin or CFR/CIF
· Payment: 30% deposit in advance, the balance against the copy of B/L; or 100% L/C, etc
· Packing: Standard seaworthy packing or as per your request .(as pictures)
· Sample: Free sample is available.